LogoLogo
🎚️ Updates👋🏽 Book a Demo🎫 Get Support🖊️ Sign-up
  • 👋Basics
    • Welcome
    • Get Started
      • Sign-up
        • Single Sign-On (SSO)
      • Create a Team
      • Create a Project
      • Create a Design
      • Grab a 7-day Trial
      • Plans
        • Community Plan
        • Essentials Plan
        • Practice Plan
        • Enterprise Plan
        • Education Plan
        • Suppliers Plan
        • Credits
        • Offers
          • Sculptform Offer
    • Get Support
      • Applications
        • Building
        • Wall
        • Floors and Subfloors
        • Roof
      • Support Tickets
      • On-demand Courses
        • Geometry
        • H1 AS1 & VM1
        • NCC 2022: J1V3
        • Moisture
        • Themes
        • Daylight
        • DTS Façade Calcs
        • Total R-values
        • NCC 2022: J1V5
        • Part J4 Building Fabric
        • 3D Geometry in SketchUp
        • H1 VM2
        • BESS: Daylight Access
        • DQLS: Daylight Modelling
        • HVAC Sizing
        • Dew Point
        • Green Star: Daylight
        • CIBSE TM59
        • G7 Natural Light
        • Advanced Shading
        • IDF Exports and Imports
        • 2D to 3D Specification
      • Project Support
      • Testing and Verification
        • EnergyPlus™ V 9.5.0 + 22.2
          • Input Output Reference
          • Engineering Reference
          • ANSI/ASHRAE Standard 140
        • Radiance V 5.2
        • Total R-value Calculations (AS/NZ 4859.2 + NZS 4214)
        • System Total R-value Calculations (CIBSE Guide A)
      • Updates
      • FAQ's
        • Design & Specification
          • Acoustic
            • Sound Pressure, Frequency and Density
            • Weighted Sound Reduction Index Rw
            • Insulation and Density
            • Acoustic Glazing
          • Climate
            • AU Climate Zones
            • The Koppen Climate Classification System
            • NIWA Weather Files
          • Comfort
          • Complaince
            • Performance-Based Design Briefs
          • Materials
            • Control Layers
            • Material Definitions
            • Material Groups
            • Vapour Resistance
            • Surface Emissivity
            • Concrete in Construction
            • Efflorescence in Masonry
            • Glazing - Types
            • Glazing – Technology and Surface Treatments
            • Glazing - Low-E Coatings
            • Framing - Thermally Broken Frames
            • Emerging Technologies - Wall Products and Systems
            • Emerging Technologies - Glazing Products and Systems
            • Glazing - Safety and Defects
            • Pliable Membranes
            • Insulation - Open Cell
            • Insulation - Closed Cell
            • Façade Systems
            • Rigid Air Barriers
        • Data And Security
        • Plans and Trials
        • Training and Workshops
        • Supplier Products
        • Billing
        • Other
  • 📘User Manual
    • Settings
      • Account Management
        • Upgrade Account
        • Update Payment Details
        • Update Profile
        • Add a Team Member
        • Delete A Team Member
        • Purchase Credits
        • Create a Theme
        • Cancel your Plan
      • Project Management
        • Copy a Project
        • Team Activity
        • Update A Project
        • Invite a Guest to a Project
        • Copy a Design to Another Project
        • Copy a Design
        • Delete a Design
        • Delete a Project
        • Delete a Team Member
        • Delete a Team
    • Wall, Roof and Floor
      • Materials
        • Select a Layout
        • Add a Material
        • Move a Material
        • Delete a Material
        • Change Material Properties
        • Adjust Insulation for Compression
        • Adjust an Air Cavity
        • Add A Thermal Break
        • Adjust Surface Emissivity
        • Add / Edit Framing
      • Module Settings
        • Total Height
        • Contact Resistance
        • Cavity Bridging
    • Building
      • Drawing
        • Import A Drawing Underlay
        • Edit Grid Settings
        • Hide Tags & Check Points
        • Flip Geometry
        • Calibrate A Drawing
        • Controlling Layers
        • Building Rotation
        • Set An Origin
        • Draw A Zone
        • Split A Zone
        • Locate Coordinates
        • Review Zones and Aspects
        • 3D View
        • Set A Zone Height
        • Define A Zones Purpose
        • Edit A Zone
        • Use Tagging
        • Duplicate Drawings
        • Matching Underlays
        • Filter Aspects
        • Filter Zones
      • Building
        • Levels
          • Add a Level
          • Duplicate a Level
          • Edit a Level
          • Add a Roof
          • Add a Daylight Grid
          • Add Shading
          • Specify a Roof
          • Add Roof Glazing
          • Add Custom Eaves
          • Project a Roof
          • Draw a Skylight
          • Specify a Skylight
        • Groups
        • Spaces
          • Create a Space
          • Update a Schedule
          • Update a Building Class
          • Add Occupants
          • Add Equipment Loads
          • Add Lighting Loads
          • Set Infiltration
          • Set Thermostats
          • Add HVAC
          • Set Sizing
        • HVAC
          • Add Plant HVAC
            • Air Handling Unit
              • Supply Air Fan
              • Return Air Fan
              • Outside Air System
              • Heating Coil
              • Cooling Coil
            • Chilled Water Loop
              • Chiller (Air Cooled)
              • Chiller (Water Cooled)
              • Four Pipe Heat Pump (Cooling)
            • Condenser Water Loop
              • Auxiliary Condenser Water Loop
              • Cooling Tower
            • Four Pipe Heat Pump
            • Hot Water Loop
              • Heating Device - Gas Boiler
              • Heating Device – Air Source Heat Pump
              • Heating Device – Four Pipe Heat Pump (Heating)
            • VRF Condenser Unit (Air Cooled)
            • Constant Air Volume System (Air Cooled)
            • Fan Coil Unit System (Air Cooled)
            • Variable Air Volume System (Air Cooled)
            • VRF Condenser Unit
          • Add Space HVAC
            • Air Terminal
              • Heating Coil
            • Fan Coil Unit
              • Cooling Coil
              • Heating Coil
              • Air Loop
            • Packaged Terminal Heat Pump (Split System)
              • Supply Air Fan
              • Heating Coil
              • Cooling Coil
            • VRF Terminal Unit
              • Air Loop
            • Constant Air Volume System (Air Cooled)
            • Fan Coil Unit System
            • Variable Air Volume System (Air Cooled)
            • Variable Refrigerant Flow
          • Select HVAC Templates
            • Fan Coil Unit - Air Cooled (EnergyPlus HVACTemplate)
            • Packaged Variable Air Volume (EnergyPlus HVACTemplate)
            • Packaged Constant Air Volume (EnergyPlus HVACTemplate)
            • Variable Refrigerant Flow (EnergyPlus HVACTemplate)
            • Central Plant and Air Handling System
            • Fan Coil Unit System (Electric Heating)
            • Fan Coil Unit System (Water Heating)
            • Four Pipe Heat Pump System
            • Variable Refrigerant Flow
            • Variable Refrigerant Flow (incl. Outside Air)
            • Water-cooled Package Unit
        • Shading
          • Add Extruded Form
          • Edit Shading
          • Surface Customisation
        • Renewables
          • Add Solar
          • Edit Solar
          • Add Renewable Energy
        • Modelling
          • Simulation
          • Site
          • Zones
          • Reporting
        • Reference Building
          • J1V3
          • V 2.6.2.2
          • H1 / VM1
      • Envelope
        • Walls
        • Roofs
        • Floors
        • Windows
        • Skylights
        • Glazed Doors
        • Opaque Doors
        • Shading
          • Add Local Shading
      • Building FAQ
        • Calculate Discharge Coefficients
        • J1V3 Reference Building - Control Thermostat
        • H1/VM1 - Infiltration and Ventilation
        • Accessing Designer Mode
        • Combining Zones
        • Adding a Skillion Roof or Sloping Ceiling
        • How do I model a Curtain Wall Spandrel?
        • Weather Data Sources
        • Create a Custom Location
    • Workflows
      • Energy Efficiency
        • H1/AS1
        • H1/AS2
        • H1/VM1
        • Part J4 Building fabric
          • J4D3 Thermal construction — general
          • J4D4 Roof and Ceiling Construction
          • J4D5 Roof Lights
          • J4D6 Walls and glazing
            • NCC 2019 Façade Calculator and Speckel
            • Specification 37
          • J4D7 Floors
        • J1V3 Verification using a reference building
        • J1V5 Verification using a reference building for a Class 2 sole-occupancy unit
          • J1P2 Performance Requirements
          • J1P3 Performance Requirements
          • J1V5 HVAC Schedules
          • J1V5 Lighting Schedules
          • J1V5 Occupancy Schedules
          • J1V5 Cooking and Appliance Schedules
          • J1V5 Internal Heat Loads
          • J1V5 Air-conditioning Setpoints
          • J1V5 Natural Ventilation Requirements
        • V2.6.2.2 Verification using a reference building
          • V2.6.2.2 Method
          • Support Materials
        • Total R-values
        • Advanced HVAC
          • Zone Control Thermostat
          • EnergyPlus Sizing Calculations
          • Demand-controlled ventilation
          • Outdoor air reset-based controls
          • Modelling four-pipe heat pumps
          • Modelling a fixed minimum air flow rate on AHUs/VAVs
          • Customise fan performance curves
          • Customise chiller performance curves
          • Design Day Weather Overview
          • Modelling air source heat pumps
          • Green Star: Reference HVAC System Type 3
          • Advanced HVAC: Typical VAV System
          • Design Day Weather Overview
          • Customise chiller performance curves
          • Customise fan performance curves
          • Modelling a fixed minimum air flow rate on AHUs/VAVs
          • Modelling four-pipe heat pumps
          • Outdoor air reset-based controls
          • Demand-controlled ventilation
          • EnergyPlus Sizing Calculations
          • Zone Control Thermostat
          • Modelling air source heat pumps
        • Energy and Thermal FAQ's
          • Thermal Comfort - PMV
          • Thermal Comfort - CBE Model
          • Total R-value
          • Solar Control
          • VRF Modeling in EnergyPlus
          • Thermal Bridging - The Basics
          • Colour
      • Daylight
        • Grid
        • Surfaces
        • Simulation Settings
        • G7/VM1
        • Green Star
        • BESS
          • Daylight Access - Living Areas
          • Daylight Access - Bedrooms
          • Winter Sunlight
        • Daylight FAQ's
          • Metrics
          • Daylight Design - Introduction
          • Daylight Design - Glazing
      • Moisture
        • Scope
          • Objective
        • Model
        • Internal Conditions
        • External Conditions
        • Moisture FAQ's
          • Wind-driven Rain?
          • Hygrothermal Convergence Errors
          • Hygrothermal Weather Data Sources?
          • Hygrothermal Material Data
          • ASHRAE Fundamentals Cavity Ventilation
          • Mould Growth Index
          • NCC 2022 Condensation Management Requirements
          • Vapour Conversions
          • HAMT FAQ
          • Can I Model a Curtain Wall Spandrel with HAMT?
      • Dew Point
        • External Conditions
        • Internal Conditions
        • Layers
      • Carbon
        • Scope and Boundaries
        • Products (A1 - A3)
        • Construction (A4 - A5)
        • In-Use (B4)
        • End-of-Use (C2)
        • Carbon FAQ's
          • Embodied Energy - Introduction
          • System Boundaries (EN 15978)
          • Material Database
          • Upfront Carbon Emissions - Transport to Site (Module A4)
          • BRANZ CO₂NSTRUCT (V2.0)
          • Database (Customised)
          • AusLCI (V1.38) Construction Carbon Emissions Factors V1Untitled
          • Life Cycle Assessment - Resources
      • Design Day
        • Settings
        • Design Day Reports
      • Designer Mode
        • Airflow Networks
          • Airflow Network Setup
          • Model Settings
          • Airflow Network Settings
            • Ventilation
          • Window Settings
          • Airflow Networks Definitions
        • CIBSE TM59
          • CIBSE TM59 Setup
  • ⏺️Recordings
    • Webinars
      • Specification 44
      • 3D Modelling
      • Part J4 Building Fabric
      • H1 Energy Efficiency: Design out Overheating with the Modelling Method
      • J1V5: The New Multi-Residential Compliance Pathway
      • NCC Shading Algorithms: Updates and Improvements
      • TM59: Design Methodology for Overheating Risk in Homes
      • Airflow Networks: J1V5, TM59 and Natural Ventilation
      • Moisture Management Updates
      • H1 Energy Efficiency Verification Methods
      • Designer Mode: Go Beyond Compliance
      • Community Plan Upgrade
      • Major Feature Release: Verification Method V2.6.2.2
      • H1 Compliance in 45 minutes: Buildings greater than 300 m2
      • H1 Compliance in 45 minutes: Housing and buildings up to 300 m2
      • Advanced HVAC Feature Overview
      • Designing for Embodied Carbon: Building for Climate Change
      • Designing for Natural Light: G7VM1 DQLS and HC5 Natural Light
      • Speckel 2.0 Release: From Compliance to Green Star
      • J1V5: A solution for flexible design or a race to the bottom?
      • NCC 2022: What's Coming This May
      • Advanced HVAC: Testing and Case Studies
      • Daylight Modelling: Planning to Rating Tools
      • Energy Plus 22.2.0: Testing and Verification
      • Life Cycle (Carbon) Assessments: Testing and Case Studies
      • H1 Energy Efficiency: From Schedule to Verification
      • H1 Energy Efficiency: Multi-unit Dwellings
    • Tutorials
      • New Spaces Release
      • Storey Height Update
      • 2D Selection Tool
      • Support Tickets
      • OpenStudio SketchUp Plug-in
      • Pollination Rhino Plug-in
      • Add Clerestory Glazing to Your roof
      • Colour Scheme Hack
      • Daylight Results - An Overview
      • G7 Natural Light Verification Method G7/VM1
      • H1: Admin and Reporting
      • NCC 2022: Shading Multipliers
      • Materials: Create Your Own
      • Daylight / Natural Light Upgrade: G7, BESS & Green Star
      • BESS Daylight Access
      • G7 Grids: A Practical Example
      • Glazing: Multiple Windows Per Aspect
      • Wall Assessments: Thermal, Carbon
      • Roof Systems: Cold, Warm and Hybrid
      • Ceiling Heights: A Practical Example
      • Default Fabric: Setting Common Glazing
      • Drawing Zones: Locking Against X and Y Axis
      • Tagging (Advanced): Create, Administer and Apply
      • Exports: Copy Tables, Images and Data
      • H1 Energy Efficiency - Multi-unit Dwellings
      • Tempered Zoning: Shifting the Thermal Line
      • Air Boundary: A Practical Example
      • External Doors: Residential + Commercial
  • 🤲Other
    • Platform Agreement
Powered by GitBook
On this page
  • HVAC Zone and System Sizing Routine
  • Coincident Plant Sizing Routine

Was this helpful?

  1. User Manual
  2. Workflows
  3. Energy Efficiency
  4. Advanced HVAC

EnergyPlus Sizing Calculations

PreviousZone Control ThermostatNextDemand-controlled ventilation

Last updated 1 year ago

Was this helpful?

This section outlines the sizing methodology applied in EnergyPlus, which encompasses the following steps:

  • Conducting a zone-by-zone heat balance load and air-flow calculation for various design days.

  • Calculating design heating and cooling capacities, as well as fluid flow rates, at the zone, system, and plant levels.

  • Employing modular, component-specific sizing algorithms for each HVAC element.

  • Providing options to monitor initial sizes' performance across multiple design days, enabling adjustments and subsequent plant-level recalculations.

Of paramount importance to the user is that EnergyPlus anchors HVAC sizing calculations on their inputs for each Zone, System (such as air handling units), and Plant loop (e.g., chilled water loop).

HVAC Zone and System Sizing Routine

The following high-level summary overviews the key steps in the EnergyPlus sizing routine for the zones and HVAC systems.

  1. Retrieve user sizing inputs for the Zone, systems, and plant.

  2. Initiate Zone design calculations. Iterate over all sizing periods, typically by each day, including the following steps:

2.1. Initialize zone design load and flow rate sequences.

2.2. Within each hour of the day, and within each time step in a zone, perform heat balance calculations, including an HVAC simulation. The ideal zonal system is employed for design load and flow rate calculations.

2.3. Save the results of the ideal zonal system calculations in the design load and flow rate sequences.

2.4. At the end of each day, calculate peaks and moving averages from the zone design sequences for each design day.

2.5. Calculate peak heating and cooling loads and flow rates for each zone over all sizing periods, which include design days and periods from the weather file, if specified. Save the corresponding design load and flow rate sequences for use in system design calculations.

  1. Initiate System (i.e. AHU) design calculations.

3.1. Obtain the necessary input for system design calculations, including information on zone and central system inputs required to determine air loop connectivity.

3.2. Loop over all sizing periods (typically by each day), including the following steps:

3.2.1. Initialise system design load and flow rate sequences.

3.2.2. Within each hour of the day and within each zone time step, obtain outside conditions and save the results of system design calculations in the system design load and flow rate sequences.

3.2.3. At the end of each day, calculate peaks and moving averages from the system design sequences for each sizing period.

3.2.4. Calculate peak heating and cooling loads and flow rates for each system over all sizing periods, which include design days and periods from the weather file, if specified. Save the corresponding design load and flow rate sequences for use in component sizing calculations.

Coincident Plant Sizing Routine

In the EnergyPlus sizing process, the Coincident sizing option for Plant Loops is now considered. If the user has chosen Coincident sizing for any plant loop, the following steps occur:

  1. Establish the data logging setup to monitor operation during HVAC Sizing Simulations. This involves selecting specific variables for recording, such as system node states or load output variables.

  2. Iterate over the specified number of Sizing Passes (default 5). This set of sizing periods, run as HVAC Sizing Simulations, can iterate up to a maximum limit on the number of passes.

  3. Conduct complete HVAC Sizing Calculations for zones, systems, plant, and components for each day, looping over all the sizing periods by each day.

  4. Record zone and HVAC data for further analysis.

  5. Retrieve log data and execute the coincident plant sizing algorithm, as detailed below.

  6. Repeat system and component sizing methods.

The coincident plant sizing algorithm can be summarised as follows:

  1. Identify the maximum mass flow rate over all sizing periods, along with the coinciding return temperature and load. Record the sizing period and timestep. This data is logged for the plant loop supply side inlet node.

  2. Determine the maximum load and the corresponding mass flow and return temperature. Record the sizing period and timestep. For heating or steam plant loops, the load is associated with the Plant Supply Side Heating Demand Rate output variable, and for cooling or condenser plant loops, it's associated with the Plant Supply Side Cooling Demand Rate output variable.

  3. Calculate a maximum design flow rate based on the maximum load from step 2, the specified temperature difference in the Plant Sizing user input, and the specific heat of the plant fluid at 5°C.

  4. Compare the flow rate from step 1 to the flow rate from step 3 and choose the higher value.

  5. Apply a sizing factor to the flow rate from step 4 as desired, with the user having different options for sizing factors.

  6. Compare the flow rate from step 5 to the current plant loop flow rate and calculate a normalized change. If the change is significant (exceeding a threshold of 0.005), adjust the size result for the plant loop, triggering resizing calculations for both the plant system and component levels. This may lead to another Sizing Pass. If the change is not significant, the sizes remain unchanged.

This method significantly impacts plant loop sizes. For instance, a hot water plant might be about half the size compared to the noncoincident sizing approach. The algorithm is particularly effective in increasing plant flow rates above pump sizes, though it can also reduce flow rates. It's not uncommon for sizes to fluctuate across multiple Sizing Passes, as the algorithm may switch between coincident flow and coincident demand to find a size that meets the conditions. Users can review detailed reports in the EIO file for insights into each algorithm's execution.

The use of coincident plant sizing can lead to more precise and efficient sizing of plant loops, especially in systems with variable load profiles and complex requirements.

📘
A high level visual summary of the EnergyPlus sizing process
Drawing