Credits are used to generate detailed calculation reports (Community Plan only) or to process large or complex models requiring additional computing resources.
On the Community Plan, detailed reports are available on-demand as a low-cost solution for building code compliance. These reports are included at no extra cost in the Essentials, Practice, and Enterprise Plans.
To generate a detailed report on the Community Plan, Credits must be pre-purchased. Credit bundles are available in 50, 250 (8% discount), and 500 (12% discount) quantities—offering greater value with higher volumes.
Credits are a game-changer for processing large models on our secure server—delivering speeds up to 20x faster than local desktop simulations. A 60-minute energy simulation can now finish in just 3 minutes!
To leverage enhanced performance, Credits are required for large models (>10,000 m² or 100+ thermal zones) or complex simulations. They’re optional for small to medium models.
Credit use per simulation is based on project size:
Small (0–4999 m²): 1 Credit
Medium (5000–9999 m²): 2 Credits
Large (10,000 m²+): 5 Credits
Moisture simulations: 1 Credit
Small (0 - 4999 m²)
1
1
Medium (5000 - 9999 m²)
2
-
Large (10,000 m² +)
5
-
While Speckel provides free compute for simple models, larger models require dedicated servers. By using our high-performance infrastructure, you can speed up analysis, save time, and achieve results more efficiently.