LogoLogo
🎚️ UpdatesπŸ‘‹πŸ½ Book a Demo🎫 Get SupportπŸ–ŠοΈ Sign-up
  • πŸ‘‹Basics
    • Welcome
    • Get Started
      • Sign-up
        • Single Sign-On (SSO)
      • Create a Team
      • Create a Project
      • Create a Design
      • Grab a 7-day Trial
      • Plans
        • Community Plan
        • Essentials Plan
        • Practice Plan
        • Enterprise Plan
        • Education Plan
        • Suppliers Plan
        • Credits
        • Offers
          • Sculptform Offer
    • Get Support
      • Applications
        • Building
        • Wall
        • Floors and Subfloors
        • Roof
      • Support Tickets
      • On-demand Courses
        • Geometry
        • H1 AS1 & VM1
        • NCC 2022: J1V3
        • Moisture
        • Themes
        • Daylight
        • DTS FaΓ§ade Calcs
        • Total R-values
        • NCC 2022: J1V5
        • Part J4 Building Fabric
        • 3D Geometry in SketchUp
        • H1 VM2
        • BESS: Daylight Access
        • DQLS: Daylight Modelling
        • HVAC Sizing
        • Dew Point
        • Green Star: Daylight
        • CIBSE TM59
        • G7 Natural Light
        • Advanced Shading
        • IDF Exports and Imports
        • 2D to 3D Specification
      • Project Support
      • Testing and Verification
        • EnergyPlusβ„’ V 9.5.0 + 22.2
          • Input Output Reference
          • Engineering Reference
          • ANSI/ASHRAE Standard 140
        • Radiance V 5.2
        • Total R-value Calculations (AS/NZ 4859.2 + NZS 4214)
        • System Total R-value Calculations (CIBSE Guide A)
      • Updates
      • FAQ's
        • Design & Specification
          • Acoustic
            • Sound Pressure, Frequency and Density
            • Weighted Sound Reduction Index Rw
            • Insulation and Density
            • Acoustic Glazing
          • Climate
            • AU Climate Zones
            • The Koppen Climate Classification System
            • NIWA Weather Files
          • Comfort
          • Complaince
            • Performance-Based Design Briefs
          • Materials
            • Control Layers
            • Material Definitions
            • Material Groups
            • Vapour Resistance
            • Surface Emissivity
            • Concrete in Construction
            • Efflorescence in Masonry
            • Glazing - Types
            • Glazing – Technology and Surface Treatments
            • Glazing - Low-E Coatings
            • Framing - Thermally Broken Frames
            • Emerging Technologies - Wall Products and Systems
            • Emerging Technologies - Glazing Products and Systems
            • Glazing - Safety and Defects
            • Pliable Membranes
            • Insulation - Open Cell
            • Insulation - Closed Cell
            • FaΓ§ade Systems
            • Rigid Air Barriers
        • Data And Security
        • Plans and Trials
        • Training and Workshops
        • Supplier Products
        • Billing
        • Other
  • πŸ“˜User Manual
    • Settings
      • Account Management
        • Upgrade Account
        • Update Payment Details
        • Update Profile
        • Add a Team Member
        • Delete A Team Member
        • Purchase Credits
        • Create a Theme
        • Cancel your Plan
      • Project Management
        • Copy a Project
        • Team Activity
        • Update A Project
        • Invite a Guest to a Project
        • Copy a Design to Another Project
        • Copy a Design
        • Delete a Design
        • Delete a Project
        • Delete a Team Member
        • Delete a Team
    • Wall, Roof and Floor
      • Materials
        • Select a Layout
        • Add a Material
        • Move a Material
        • Delete a Material
        • Change Material Properties
        • Adjust Insulation for Compression
        • Adjust an Air Cavity
        • Add A Thermal Break
        • Adjust Surface Emissivity
        • Add / Edit Framing
      • Module Settings
        • Total Height
        • Contact Resistance
        • Cavity Bridging
    • Building
      • Drawing
        • Import A Drawing Underlay
        • Edit Grid Settings
        • Hide Tags & Check Points
        • Flip Geometry
        • Calibrate A Drawing
        • Controlling Layers
        • Building Rotation
        • Set An Origin
        • Draw A Zone
        • Split A Zone
        • Locate Coordinates
        • Review Zones and Aspects
        • 3D View
        • Set A Zone Height
        • Define A Zones Purpose
        • Edit A Zone
        • Use Tagging
        • Duplicate Drawings
        • Matching Underlays
        • Filter Aspects
        • Filter Zones
      • Building
        • Levels
          • Add a Level
          • Duplicate a Level
          • Edit a Level
          • Add a Roof
          • Add a Daylight Grid
          • Add Shading
          • Specify a Roof
          • Add Roof Glazing
          • Add Custom Eaves
          • Project a Roof
          • Draw a Skylight
          • Specify a Skylight
        • Groups
        • Spaces
          • Create a Space
          • Update a Schedule
          • Update a Building Class
          • Add Occupants
          • Add Equipment Loads
          • Add Lighting Loads
          • Set Infiltration
          • Set Thermostats
          • Add HVAC
          • Set Sizing
        • HVAC
          • Add Plant HVAC
            • Air Handling Unit
              • Supply Air Fan
              • Return Air Fan
              • Outside Air System
              • Heating Coil
              • Cooling Coil
            • Chilled Water Loop
              • Chiller (Air Cooled)
              • Chiller (Water Cooled)
              • Four Pipe Heat Pump (Cooling)
            • Condenser Water Loop
              • Auxiliary Condenser Water Loop
              • Cooling Tower
            • Four Pipe Heat Pump
            • Hot Water Loop
              • Heating Device - Gas Boiler
              • Heating Device – Air Source Heat Pump
              • Heating Device – Four Pipe Heat Pump (Heating)
            • VRF Condenser Unit (Air Cooled)
            • Constant Air Volume System (Air Cooled)
            • Fan Coil Unit System (Air Cooled)
            • Variable Air Volume System (Air Cooled)
            • VRF Condenser Unit
          • Add Space HVAC
            • Air Terminal
              • Heating Coil
            • Fan Coil Unit
              • Cooling Coil
              • Heating Coil
              • Air Loop
            • Packaged Terminal Heat Pump (Split System)
              • Supply Air Fan
              • Heating Coil
              • Cooling Coil
            • VRF Terminal Unit
              • Air Loop
            • Constant Air Volume System (Air Cooled)
            • Fan Coil Unit System
            • Variable Air Volume System (Air Cooled)
            • Variable Refrigerant Flow
          • Select HVAC Templates
            • Fan Coil Unit - Air Cooled (EnergyPlus HVACTemplate)
            • Packaged Variable Air Volume (EnergyPlus HVACTemplate)
            • Packaged Constant Air Volume (EnergyPlus HVACTemplate)
            • Variable Refrigerant Flow (EnergyPlus HVACTemplate)
            • Central Plant and Air Handling System
            • Fan Coil Unit System (Electric Heating)
            • Fan Coil Unit System (Water Heating)
            • Four Pipe Heat Pump System
            • Variable Refrigerant Flow
            • Variable Refrigerant Flow (incl. Outside Air)
            • Water-cooled Package Unit
        • Shading
          • Add Extruded Form
          • Edit Shading
          • Surface Customisation
        • Renewables
          • Add Solar
          • Edit Solar
          • Add Renewable Energy
        • Modelling
          • Simulation
          • Site
          • Zones
          • Reporting
        • Reference Building
          • J1V3
          • V 2.6.2.2
          • H1 / VM1
      • Envelope
        • Walls
        • Roofs
        • Floors
        • Windows
        • Skylights
        • Glazed Doors
        • Opaque Doors
        • Shading
          • Add Local Shading
      • Building FAQ
        • Calculate Discharge Coefficients
        • J1V3 Reference Building - Control Thermostat
        • H1/VM1 - Infiltration and Ventilation
        • Accessing Designer Mode
        • Combining Zones
        • Adding a Skillion Roof or Sloping Ceiling
        • How do I model a Curtain Wall Spandrel?
        • Weather Data Sources
        • Create a Custom Location
    • Workflows
      • Energy Efficiency
        • H1/AS1
        • H1/AS2
        • H1/VM1
        • Part J4 Building fabric
          • J4D3 Thermal construction β€” general
          • J4D4 Roof and Ceiling Construction
          • J4D5 Roof Lights
          • J4D6 Walls and glazing
            • NCC 2019 FaΓ§ade Calculator and Speckel
            • Specification 37
          • J4D7 Floors
        • J1V3 Verification using a reference building
        • J1V5 Verification using a reference building for a Class 2 sole-occupancy unit
          • J1P2 Performance Requirements
          • J1P3 Performance Requirements
          • J1V5 HVAC Schedules
          • J1V5 Lighting Schedules
          • J1V5 Occupancy Schedules
          • J1V5 Cooking and Appliance Schedules
          • J1V5 Internal Heat Loads
          • J1V5 Air-conditioning Setpoints
          • J1V5 Natural Ventilation Requirements
        • V2.6.2.2 Verification using a reference building
          • V2.6.2.2 Method
          • Support Materials
        • Total R-values
        • Advanced HVAC
          • Zone Control Thermostat
          • EnergyPlus Sizing Calculations
          • Demand-controlled ventilation
          • Outdoor air reset-based controls
          • Modelling four-pipe heat pumps
          • Modelling a fixed minimum air flow rate on AHUs/VAVs
          • Customise fan performance curves
          • Customise chiller performance curves
          • Design Day Weather Overview
          • Modelling air source heat pumps
          • Green Star: Reference HVAC System Type 3
          • Advanced HVAC: Typical VAV System
          • Design Day Weather Overview
          • Customise chiller performance curves
          • Customise fan performance curves
          • Modelling a fixed minimum air flow rate on AHUs/VAVs
          • Modelling four-pipe heat pumps
          • Outdoor air reset-based controls
          • Demand-controlled ventilation
          • EnergyPlus Sizing Calculations
          • Zone Control Thermostat
          • Modelling air source heat pumps
        • Energy and Thermal FAQ's
          • Thermal Comfort - PMV
          • Thermal Comfort - CBE Model
          • Total R-value
          • Solar Control
          • VRF Modeling in EnergyPlus
          • Thermal Bridging - The Basics
          • Colour
      • Daylight
        • Grid
        • Surfaces
        • Simulation Settings
        • G7/VM1
        • Green Star
        • BESS
          • Daylight Access - Living Areas
          • Daylight Access - Bedrooms
          • Winter Sunlight
        • Daylight FAQ's
          • Metrics
          • Daylight Design - Introduction
          • Daylight Design - Glazing
      • Moisture
        • Scope
          • Objective
        • Model
        • Internal Conditions
        • External Conditions
        • Moisture FAQ's
          • Wind-driven Rain?
          • Hygrothermal Convergence Errors
          • Hygrothermal Weather Data Sources?
          • Hygrothermal Material Data
          • ASHRAE Fundamentals Cavity Ventilation
          • Mould Growth Index
          • NCC 2022 Condensation Management Requirements
          • Vapour Conversions
          • HAMT FAQ
          • Can I Model a Curtain Wall Spandrel with HAMT?
      • Dew Point
        • External Conditions
        • Internal Conditions
        • Layers
      • Carbon
        • Scope and Boundaries
        • Products (A1 - A3)
        • Construction (A4 - A5)
        • In-Use (B4)
        • End-of-Use (C2)
        • Carbon FAQ's
          • Embodied Energy - Introduction
          • System Boundaries (EN 15978)
          • Material Database
          • Upfront Carbon Emissions - Transport to Site (Module A4)
          • BRANZ COβ‚‚NSTRUCT (V2.0)
          • Database (Customised)
          • AusLCI (V1.38) Construction Carbon Emissions Factors V1Untitled
          • Life Cycle Assessment - Resources
      • Design Day
        • Settings
        • Design Day Reports
      • Designer Mode
        • Airflow Networks
          • Airflow Network Setup
          • Model Settings
          • Airflow Network Settings
            • Ventilation
          • Window Settings
          • Airflow Networks Definitions
        • CIBSE TM59
          • CIBSE TM59 Setup
  • ⏺️Recordings
    • Webinars
      • Specification 44
      • 3D Modelling
      • Part J4 Building Fabric
      • H1 Energy Efficiency: Design out Overheating with the Modelling Method
      • J1V5: The New Multi-Residential Compliance Pathway
      • NCC Shading Algorithms: Updates and Improvements
      • TM59: Design Methodology for Overheating Risk in Homes
      • Airflow Networks: J1V5, TM59 and Natural Ventilation
      • Moisture Management Updates
      • H1 Energy Efficiency Verification Methods
      • Designer Mode: Go Beyond Compliance
      • Community Plan Upgrade
      • Major Feature Release: Verification Method V2.6.2.2
      • H1 Compliance in 45 minutes: Buildings greater than 300 m2
      • H1 Compliance in 45 minutes: Housing and buildings up to 300 m2
      • Advanced HVAC Feature Overview
      • Designing for Embodied Carbon: Building for Climate Change
      • Designing for Natural Light: G7VM1 DQLS and HC5 Natural Light
      • Speckel 2.0 Release: From Compliance to Green Star
      • J1V5: A solution for flexible design or a race to the bottom?
      • NCC 2022: What's Coming This May
      • Advanced HVAC: Testing and Case Studies
      • Daylight Modelling: Planning to Rating Tools
      • Energy Plus 22.2.0: Testing and Verification
      • Life Cycle (Carbon) Assessments: Testing and Case Studies
      • H1 Energy Efficiency: From Schedule to Verification
      • H1 Energy Efficiency: Multi-unit Dwellings
    • Tutorials
      • New Spaces Release
      • Storey Height Update
      • 2D Selection Tool
      • Support Tickets
      • OpenStudio SketchUp Plug-in
      • Pollination Rhino Plug-in
      • Add Clerestory Glazing to Your roof
      • Colour Scheme Hack
      • Daylight Results - An Overview
      • G7 Natural Light Verification Method G7/VM1
      • H1: Admin and Reporting
      • NCC 2022: Shading Multipliers
      • Materials: Create Your Own
      • Daylight / Natural Light Upgrade: G7, BESS & Green Star
      • BESS Daylight Access
      • G7 Grids: A Practical Example
      • Glazing: Multiple Windows Per Aspect
      • Wall Assessments: Thermal, Carbon
      • Roof Systems: Cold, Warm and Hybrid
      • Ceiling Heights: A Practical Example
      • Default Fabric: Setting Common Glazing
      • Drawing Zones: Locking Against X and Y Axis
      • Tagging (Advanced): Create, Administer and Apply
      • Exports: Copy Tables, Images and Data
      • H1 Energy Efficiency - Multi-unit Dwellings
      • Tempered Zoning: Shifting the Thermal Line
      • Air Boundary: A Practical Example
      • External Doors: Residential + Commercial
  • 🀲Other
    • Platform Agreement
Powered by GitBook
On this page

Was this helpful?

  1. User Manual
  2. Workflows
  3. Carbon
  4. Carbon FAQ's

AusLCI (V1.38) Construction Carbon Emissions Factors V1Untitled

PreviousDatabase (Customised)NextLife Cycle Assessment - Resources

Last updated 2 years ago

Was this helpful?

The AusLCI Carbon Emissions Factors contains emissions data in kg CO2e for the AusLCI database. Data is included for several different impact assessment methods.

A set of emission factors for the construction sector was released in May 22, including genuine AusLCI data and selected emission factors from the shadow database. The shadow database is used to support gaps in AusLCI data.

The shadow database is an Australianised version of the Ecoinvent 2.2 database based on typical European/global practice but where all input flows have been changed to AusLCI where process data is available - for example, all electricity, transport, natural gas, etc. are changed to Australian inputs as well as any material data.

Select a 'Climate change - CN' value corresponding to material selection to use this database.

Material

Unit

Climate change - CN

Climate change - CN (Infr Excl)

Climate change - total

Climate change - total (Infr Excl)

Blast furnace slag allocation, at steel plant

kg

0.02

0.02

0.02

0.02

Fly ash, delivered to plant

kg

0.02

0.01

0.02

0.01

general purpose cement, at plant

kg

0.90

0.89

0.90

0.89

General purpose cement, Australian average

kg

0.94

0.92

0.94

0.92

General purpose cement, imported clinker

kg

1.05

1.02

1.05

1.02

Ground granulated blast furnace slag, at cement plant

kg

0.20

0.17

0.20

0.17

Grdinary portland cement, at plant

kg

0.95

0.94

0.95

0.94

Ordinary portland cement, Australian average

kg

0.99

0.97

0.99

0.97

Ordinary portland cement, imported clinker

kg

1.11

1.07

1.11

1.07

Concrete 20 MPa 30% fly ash, at batching plant

m3

230.84

218.34

230.84

218.38

Concrete 20 MPa 30% GGBFS, at batching plant

m3

250.18

236.01

250.17

236.04

Concrete 20 MPa, at batching plant

m3

312.85

299.26

312.83

299.31

Concrete 25 MPa 30% fly ash, at batching plant

m3

259.35

245.53

259.34

245.57

Concrete 25 MPa 30% GGBFS, at batching plant

m3

280.75

265.09

280.74

265.13

Concrete 25 MPa, at batching plant

m3

350.12

335.10

350.09

335.16

Concrete 32 MPa 30% fly ash, at batching plant

m3

296.60

281.70

296.59

281.75

Concrete 32 MPa 30% GGBFS, at batching plant

m3

321.46

304.42

321.43

304.46

Concrete 32 MPa, at batching plant

m3

401.98

385.70

401.95

385.76

Concrete 40 MPa 30% fly ash, at batching plant

m3

356.27

339.61

356.25

339.66

Concrete 40 MPa 30% GGBFS, at batching plant

m3

386.65

367.37

386.61

367.42

Concrete 40 MPa, at batching plant

m3

485.02

466.68

484.98

466.75

Concrete 50 MPa 30% fly ash, at batching plant

m3

452.78

432.14

452.74

432.21

Concrete 50 MPa 30% GGBFS, at batching plant

m3

490.75

466.84

490.70

466.91

Concrete 50 MPa, at batching plant

m3

613.65

590.92

613.58

591.02

Concrete pipes, geopolymer, at plant

kg

0.16

0.14

0.16

0.14

Plaster, at plant

kg

0.19

0.17

0.19

0.17

Plasterboard 10 mm, at regional store

m2

4.54

2.97

3.73

2.11

Plasterboard, 10mm, at plant

m2

4.32

2.82

3.51

1.96

Asphalt, hot mix, 2% virgin bitumen, at plant

kg

0.04

0.04

0.04

0.04

Asphalt, hot mix, 3% virgin bitumen, at plant

kg

0.05

0.04

0.05

0.04

Asphalt, hot mix, 4% virgin bitumen, at plant

kg

0.06

0.05

0.06

0.05

Asphalt, hot mix, 5% virgin bitumen, at plant

kg

0.07

0.06

0.07

0.06

Asphalt, Recycled Asphalt Product (RAP), at point of origin

kg

x

x

x

x

Asphalt, standard hot mix, 5.5% virgin bitumen, at plant

kg

0.07

0.06

0.07

0.06

Asphalt, standard warm mix, 5.5% virgin bitumen, at plant

kg

0.00

0.00

0.00

0.00

Asphalt, warm mix, 2% virgin bitumen, at plant

kg

0.04

0.03

0.04

0.03

Asphalt, warm mix, 3% virgin bitumen, at plant

kg

0.05

0.04

0.05

0.04

Asphalt, warm mix, 4% virgin bitumen, at plant

kg

0.05

0.05

0.05

0.05

Asphalt, warm mix, 5% virgin bitumen, at plant

kg

0.06

0.05

0.06

0.05

Water pump, irrigation, 25kg

p

178.21

175.12

178.08

175.08

Expanded vermiculite, at plant

kg

0.26

0.25

0.26

0.25

Products from concrete recycling

kg

0.01

0.00

0.01

0.00

Recycled aggregate, at plant

kg

0.01

0.00

0.01

0.00

Recycled steel from concrete Recycling, at plant

kg

0.03

0.02

0.03

0.02

High-density polyethylene, average, at plant

kg

2.40

2.38

2.40

2.38

High-density polyethylene, gas phase process, at plant

kg

2.47

2.45

2.47

2.45

High density polyethylene, slurry polymerisation process, at plant

kg

2.34

2.32

2.35

2.32

Linear low density polyethylene, at plant

kg

2.58

2.56

2.58

2.56

Low density polyethylene, at plant

kg

3.68

3.66

3.68

3.66

Polypropylene, PP, at factory gate

kg

2.71

2.68

2.71

2.68

Gravel, crushed, at mine

kg

0.01

0.01

0.01

0.01

Gravel, round, at mine

kg

0.00

0.00

0.00

0.00

Gravel, unspecified, at mine

kg

0.01

0.00

0.01

0.00

Limestone, at mine

kg

0.00

0.00

0.00

0.00

Limestone, crushed, for mill

kg

0.00

0.00

0.00

0.00

Limestone, crushed, washed

kg

0.00

0.00

0.00

0.00

Limestone, milled, loose, at plant

kg

0.02

0.02

0.02

0.02

Limestone, milled, packed, at plant

kg

0.03

0.03

0.04

0.04

Sand, at mine

kg

0.00

0.00

0.00

0.00

Vermiculite, at mine

kg

0.00

0.00

0.00

0.00

Bitumen, at refinery

kg

0.48

0.38

0.48

0.38

Brick, at plant

kg

0.24

0.24

0.23

0.22

Cladding, crossbar-pole, aluminium, at plant

m2

189.95

178.31

188.54

176.66

Acrylic filler, at plant

kg

0.47

0.44

0.47

0.44

Roof tile, at plant

kg

0.37

0.36

0.37

0.36

Door, inner, glass-wood, at plant

m2

62.78

57.61

13.66

8.40

Door, inner, wood, at plant

m2

49.39

44.58

-15.80

-20.70

Door, outer, wood-aluminium, at plant

m2

115.92

110.06

90.28

84.36

Door, outer, wood-glass, at plant

m2

113.86

107.85

98.03

91.96

Cork slab, at plant

kg

1.50

1.40

-0.31

-0.41

Foam glass, at plant

kg

2.24

2.18

2.26

2.20

Polystyrene foam slab, at plant

kg

4.53

4.52

4.56

4.54

Polystyrene, extruded (XPS) CO2 blown, at plant

kg

4.20

4.14

4.23

4.17

Polystyrene, extruded (XPS), at plant

kg

11.47

11.39

11.49

11.41

Polystyrene, extruded (XPS), HFC-134a blown, at plant

kg

31.16

31.06

31.18

31.09

Polystyrene, extruded (XPS), HFC-152a blown, at plant

kg

6.30

6.21

6.32

6.23

Acrylic varnish, 87.5% in H2O, at plant

kg

2.14

1.98

2.14

1.98

Alkyd paint, white, 60% in H2O, at plant

kg

2.84

2.70

2.65

2.50

Alkyd paint, white, 60% in solvent, at plant

kg

3.04

2.79

2.77

2.52

Polysulphide, sealing compound, at plant

kg

1.73

1.59

1.74

1.60

Air filter, central unit, 600 m3

p

2.11

1.99

2.11

1.99

Air filter, decentralized unit, 180-250 m3

p

1.66

1.57

1.47

1.39

Air filter, decentralized unit, 250 m3

p

0.40

0.38

0.37

0.35

Air filter, in exhaust air valve, at plant

p

0.49

0.47

0.49

0.47

Connection piece, steel, 100x50 mm, at plant

p

1.05

0.97

1.05

0.97

Control and wiring, central unit, at plant

p

34.83

31.52

34.80

31.44

Control and wiring, decentralized unit, at plant

p

26.11

23.48

26.11

23.45

Elbow 90Β°, steel, 100x50 mm, at plant

p

1.45

1.33

1.45

1.33

Flexible duct, aluminum

m

1.40

1.32

1.38

1.30

Ground heat exchanger, PE, DN 200, at plant

m

11.04

10.50

10.92

10.38

Insulation spiral-seam duct, rockwool, DN 400, 30 mm, at plant

m

25.54

24.04

25.46

23.96

Outside air intake, stainless steel, DN 370, at plant

p

198.28

181.97

198.18

181.76

Overflow element, steel, approx. 40 m3

p

5.31

4.83

5.29

4.80

Sealing tape, aluminum

m

0.30

0.27

0.30

0.27

Spiral-seam duct, steel, DN 125, at plant

m

9.89

9.05

9.89

9.05

Spiral-seam duct, steel, DN 400, at plant

m

30.55

27.94

30.56

27.94

Supply air inlet, steel

p

10.07

9.15

10.08

9.15

Ventilation duct, PE corrugated tube, DN 75, at plant

m

1.22

1.16

1.20

1.14

Ventilation duct, steel, 100x50 mm, at plant

m

7.52

6.87

7.52

6.87

Ventilation equipment, Avent E 97, at plant

p

525.54

505.33

525.36

505.25

Ventilation equipment, central, 600-1200 m3

p

1092.41

1025.51

1091.78

1024.70

Ventilation equipment, decentralized, 180-250 m3

p

334.76

315.42

334.57

315.14

Ventilation equipment, KWL 250, at plant

p

298.50

279.92

298.43

279.79

Ventilation equipment, KWLC 1200, at plant

p

1300.72

1221.36

1299.92

1220.36

Ventilation equipment, Storkair G 90, at plant

p

171.55

158.12

171.53

157.97

Ventilation equipment, Twl-700, at plant

p

901.19

845.31

900.67

844.63

Window frame, aluminium, U=1.6 W

m2

713.77

696.82

712.51

695.71

Window frame, plastic (PVC), U=1.6 W

m2

273.85

261.53

272.21

259.62

Window frame, wood-metal, U=1.6 W

m2

359.53

341.07

247.34

228.68

Window frame, wood, U=1.5 W

m2

189.79

175.04

68.34

53.31

Modified starch, at plant

kg

1.82

1.68

1.48

1.35

Acrylonitrile-butadiene-styrene copolymer, ABS, at plant

kg

4.52

4.50

4.54

4.52

Bitumen sealing, at plant

kg

1.23

1.08

1.21

1.05

Polybutadiene, at plant

kg

3.96

3.96

3.98

3.97

Styrene-acrylonitrile copolymer, SAN, at plant

kg

4.19

4.17

4.20

4.19

Synthetic rubber, at plant

kg

3.25

3.05

3.21

3.01

Ethylene vinyl acetate copolymer, at plant

kg

2.89

2.75

2.88

2.74

Ethylvinylacetate, foil, at plant

kg

3.71

3.54

3.61

3.44

Fleece, polyethylene, at plant

kg

3.51

3.40

3.48

3.37

Glass fibre reinforced plastic, polyamide, injection moulding, at plant

kg

9.30

9.24

9.28

9.22

Glass fibre reinforced plastic, polyester resin, hand lay-up, at plant

kg

5.35

5.14

5.35

5.14

Nylon 6, at plant

kg

9.13

9.13

9.14

9.14

Nylon 6, glass-filled, at plant

kg

7.32

7.32

7.34

7.34

Nylon 66, at plant

kg

8.13

8.13

8.16

8.16

Nylon 66, glass-filled, at plant

kg

7.11

7.11

7.14

7.14

Packaging film, LDPE, at plant

kg

4.51

4.46

4.42

4.37

Polycarbonate, at plant

kg

7.99

7.98

8.00

7.99

Polyethylene terephthalate, granulate, amorphous, at plant

kg

3.15

2.94

3.16

2.94

Polyethylene terephthalate, granulate, bottle grade, at plant

kg

3.41

3.13

3.42

3.13

Polyethylene, LLDPE, granulate, at plant

kg

2.58

2.56

2.58

2.56

Polymethyl methacrylate, beads, at plant

kg

7.27

7.27

7.29

7.29

Polymethyl methacrylate, sheet, at plant

kg

8.56

8.56

8.61

8.61

Polystyrene, expandable, at plant

kg

3.47

3.47

3.50

3.50

Polystyrene, general purpose, GPPS, at plant

kg

3.60

3.60

3.62

3.62

Polystyrene, high impact, HIPS, at plant

kg

3.58

3.58

3.61

3.60

Polyvinylchloride, at regional storage

kg

2.02

2.01

2.03

2.02

Polyvinylchloride, bulk polymerised, at plant

kg

2.00

2.00

2.01

2.01

Polyvinylchloride, emulsion polymerised, at plant

kg

2.53

2.53

2.53

2.53

Polyvinylchloride, suspension polymerised, at plant

kg

1.92

1.92

1.93

1.93

Polyvinylidenchloride, granulate, at plant

kg

5.01

5.00

5.03

5.02

Tetrafluoroethylene film, on glass

kg

337.32

335.82

337.33

335.83

Tetrafluoroethylene, at plant

kg

320.86

319.51

320.86

319.51

Polyurethane, flexible foam, at plant

kg

5.08

5.00

5.17

5.09

Polyurethane, rigid foam, at plant

kg

4.55

4.47

4.60

4.52

Bark chips, softwood, u=140%, at forest road

m3

4.80

4.47

-796.99

-797.33

Wood chips, hardwood, from industry, u=40%, at plant

m3

7.41

7.06

-420.40

-420.75

Wood chips, hardwood, u=80%, at forest

m3

6.14

3.82

-429.01

-431.33

Wood chips, mixed, from industry, u=40%, at plant

m3

5.75

5.41

-331.36

-331.70

Wood chips, mixed, u=120%, at forest

m3

6.17

3.40

-336.28

-339.04

Wood chips, softwood, from industry, u=40%, at plant

m3

5.11

4.77

-296.73

-297.07

Wood chips, softwood, u=140%, at forest

m3

6.18

3.24

-300.22

-303.15

Hardwood, stand establishment

m3

4.18

3.29

4.15

3.25

Industrial residual wood, azobe (SFM), u=15%, CM, at sawmill

m3

66.53

55.55

-1741.09

-1752.06

Industrial residue wood, 3-layered LB production, softwood, u=20%, at plant

m3

11.35

10.35

-791.69

-792.70

Industrial residue wood, from planing, hard, air

m3

23.68

21.97

-1114.56

-1116.29

Industrial residue wood, from planing, hardwood, kiln dried, u=10%, at plant

m3

25.54

23.71

-1112.63

-1114.47

Industrial residue wood, from planing, softwood, air dried, u=20%, at plant

m3

10.71

9.41

-786.53

-787.86

Industrial residue wood, from planing, softwood, kiln dried, u=10%, at plant

m3

12.77

11.37

-784.38

-785.80

Industrial residue wood, hardwood, including bark, air dried, u=20%, at plant

m3

10.70

10.04

-1153.32

-1153.98

Industrial residue wood, hardwood, including bark, u=70%, at plant

m3

9.39

8.81

-1152.45

-1153.03

Industrial residue wood, LTE production, softwood, u=20%, at plant

m3

13.97

12.18

-780.69

-782.49

Industrial residue wood, mix, hardwood, u=40%, at plant

m3

9.36

8.78

-1153.18

-1153.76

Industrial residue wood, mix, softwood, u=40%, at plant

m3

6.14

5.49

-798.75

-799.41

Industrial residue wood, softwood, forest-debarked, air dried, u=20%, at plant

m3

6.64

5.93

-798.16

-798.87

Industrial residue wood, softwood, forest-debarked, u=70%, at plant

m3

6.04

5.39

-798.95

-799.59

Industrial residue wood, softwood, plant-debarked, u=70%, at plant

m3

5.91

5.26

-798.76

-799.42

Industrial wood, hardwood, under bark, u=80%, at forest road

m3

8.80

2.82

-1313.85

-1319.82

Industrial wood, softwood, under bark, u=140%, at forest road

m3

11.39

3.52

-887.13

-894.99

Raw cork, at forest road

kg

0.02

0.02

-1.69

-1.70

Residual wood, hardwood, under bark, air dried, u=20%, at forest road

m3

10.54

3.41

-1319.20

-1326.32

Residual wood, hardwood, under bark, u=80%, at forest road

m3

9.25

2.99

-1314.52

-1320.77

Residual wood, softwood, under bark, air dried, u=20%, at forest road

m3

14.34

4.39

-883.32

-893.26

Residual wood, softwood, under bark, u=140%, at forest road

m3

13.04

3.99

-883.78

-892.81

Round wood, softwood, debarked, u=70% at forest road

m3

39.56

36.77

-666.72

-669.51

Roundwood, azobe (SFM), debarked, u=30%, CM, at maritime harbour

m3

254.28

211.01

-1552.33

-1595.55

Roundwood, meranti (SFM), debarked, u=70%, MY, at maritime harbour

m3

275.19

219.26

-823.08

-878.95

Softwood, stand establishment

m3

1.88

1.47

1.86

1.45

Wood, cork oak, under bark, u=70%, at forest road

m3

0.27

0.23

-1179.21

-1179.25

Fibreboard hard, at plant

m3

705.47

680.22

-1341.73

-1366.82

Glued laminated timber, indoor use, at plant

m3

327.04

297.71

-219.16

-248.65

Glued laminated timber, outdoor use, at plant

m3

346.40

314.63

-199.40

-231.32

Laminated timber element, transversally prestressed, for outdoor use, at plant

m3

280.56

254.41

-264.23

-290.52

Medium density fibreboard, at plant

m3

607.64

570.53

-831.43

-868.47

Oriented strand board, at plant

m3

395.82

358.52

-486.36

-523.67

Particle board, indoor use, at plant

m3

302.73

273.18

-868.27

-897.91

Particle board, outdoor use, at plant

m3

406.93

376.71

-763.88

-794.15

Plywood, indoor use, at plant

m3

920.13

850.35

-52.39

-122.13

Plywood, outdoor use, at plant

m3

1071.69

984.91

99.21

12.42

Sawn timber (SFM), azobe, planed, air dried, u=15%, CM, at sawmill

m3

479.04

399.95

-1326.26

-1405.26

Sawn timber, hardwood, planed, air

m3

351.63

326.26

-267.28

-292.96

Sawn timber, hardwood, planed, kiln dried, u=10%, at plant

m3

379.26

352.15

-238.51

-265.91

Sawn timber, hardwood, raw, air

m3

282.29

264.92

-404.57

-422.01

Sawn timber, hardwood, raw, air dried, u=20%, at plant

m3

270.17

253.56

-417.19

-433.87

Sawn timber, hardwood, raw, kiln dried, u=10%, at plant

m3

306.55

287.66

-379.30

-398.25

Sawn timber, hardwood, raw, plant-debarked, u=70%, at plant

m3

236.99

222.42

-506.73

-521.36

Sawn timber, paranΓ‘ pine (SFM), u=15%, BR, at maritime harbour

m3

758.72

685.10

153.09

79.48

Sawn timber, softwood, planed, air dried, at plant

m3

159.06

139.78

-433.04

-452.65

Sawn timber, softwood, planed, kiln dried, at plant

m3

189.64

168.81

-401.04

-422.19

Sawn timber, softwood, raw, air dried, u=20%, at plant

m3

113.14

101.12

-505.92

-518.02

Sawn timber, softwood, raw, forest-debarked, u=70%, at plant

m3

102.86

91.93

-533.28

-544.28

Sawn timber, softwood, raw, kiln dried, u=10%, at plant

m3

140.00

126.61

-477.82

-491.27

Sawn timber, softwood, raw, kiln dried, u=20%, at plant

m3

130.89

118.06

-487.35

-500.25

Sawn timber, softwood, raw, plant-debarked, u=70%, at plant

m3

100.71

89.68

-533.39

-544.50

Three layered laminated board, at plant

m3

477.16

435.18

137.39

95.23

Wood pellets, u=10%, at storehouse

m3

162.56

156.04

-984.69

-991.13

Wood wool, u=20%, at plant

kg

0.09

0.07

-1.54

-1.56